OWNER:

USDA Forest Service

POC: Michael Wilcox

709 W 9th Street
Juneau, AK

Telephone: (907) 586-9379

Completion Date:
September 2007

ASBESTOS ABATEMENT/ CONCRETE DEMOLITON

Whittier Fire Hall Concrete Demolition , Whittier, Alaska

The Old Whittier Fire Hall included a 6,400 sq. ft. primary building built in 1952. The building was used by the DOD as a firehouse from 1952 to 1967.  In 2005, a majority of the asbestos-containing materials (ACM) and lead-based paint (LBP) was abated.  Some minor amounts of ACM and LBP remained in the structure.

 

The scope of work for this project included the following:

  • Abate loose Lead-Based Paint (LBP) chips and remaining Cement Asbestos Board (CAB)
  • Demolition of Structure
  • Removal of LBP-impacted soil at building perimeter
  • Recycle LBP-Concrete
  • Dispose/recycle demolition debris
  • Dispose of ACM and LBP-Wastes
  • Site Restoration

In Anchorage call (907) 349-2511 or toll free 1-800-770-2512 FAX (907) 522-3150
11711 South Gambell Street • Anchorage, AK 99515 • email info@chemtrack.net